1.This permission expires on 30th November 2010 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority the use shall be discontinued and the site restored in accordance with the schedule accompanying the submitted application. The reason for the condition is:- In order to retain control over the use of the site and in the interest of the amenities of the locality.
2.No construction work to form the lagoon system or materials deposited in the lagoons shall be carried on the site outside the following times :- Monday to Friday 07.30 to 18.00 hrs and and Saturday 08.00 to 13.00 hrs, with no work on Sundays or Bank Holidays. The reason for the condition is :- In the interests of the residential amenities of the area.
3.The applicant shall fully reinstate any damage caused to the public highway by construction traffic to and from the application site, to the satisfaction of the highway authority, during and on completion of the proposed works. The reason for the condition is:- In the intersts of highway safety.
4.The parking area/hardstanding area indicated on drawing OEA 04 shall be laid out in accordance with the submitted details and shall be maintained for the duration of the woks on the site. The reason for the condition is :- To ensure the avaliability of parking and manoeuvering area to serve the proposed use of the site.
5.No development shall take place within the site until the applicant, or their agents or successors in title, has secured the implementation of a programme of archaeological mitigatory work in accordance with a written scheme of investigation which has been submitted to and approved in writing by the local planning authority, which programme shall (for the avoidance of doubt) include (if considered by the LPA to be necessary) post excavation assessment, analysis, archiving and publication of results to the satisfaction of the LPA. The programme of work in this instance will comprise an archaeological 'strip, map and sample' excavation of the area of the proposed lagoons. The reason for the condition is :- In order to enable investigation and recording of the site of archaeological interest to take place during the period of building or engineering works.
6.REASON FOR APPROVAL OF THE APPLICATION :- The proposal is considered to be acceptable on a temporary basis given the overall environmental improvements that will be forthcoming as a result of the mudpumping and the associated improvements to the farmland on the application site.
7.NOTES - Please read the following notes carefully:- Norfolk Landscape Archaeology advise in this instance will comprise an archaeological 'strip, map and sample' excavation of the proposed lagoons. A copy of the brief for the Archaeological work is attached.