| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No part of the proposed works or structure shall overhang or encroach upon highway land and no door shall open outwards over the public footway.
The reason for the condition is :-
To prevent obstruction of the public highway/footway in the interests of highway/footway safety.
|
| 3. | Floor levels within the proposed development will be set no lower than existing levels AND flood proofing of the proposed development has been incorporated where appropriate.
The reason for the condition is :-
to ensure the safety of the building and its occupants in case of flooding. |
| 4. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particular, policies SHP8 and BNV18. |
| 5. | The applicants attention is drawn to the following note:
The grant of permission does not include approval for any signs which will require seperate advertisment consent. |