| No. | Condition Text |
|---|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The proposed works shall be constructed with adequate drainage measures to prevent surface water run-off onto the adjacent public highway and residential dwellings. No development shall take place until a detailed scheme showing drainage measures has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority. The drainage system shall be retained in perpetuity and maintained free of obstruction and blockage at all times to ensure adequate drainage of the site. The reason for the condition is :- To ensure the driveway does not drain onto adjacent properties and to prevent flooding of the public highway from surface water run-off. |
| 3. | REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan. |