| No. | Condition Text |
|---|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No part of the proposed structure shall overhang or encroach upon the highway boundary and no gate, if installed shall open outwards over highway land. The reason for the condition is :- To prevent obstruction of the public highway in the interests of highway safety. |
| 3. | The wall shall be constructed entirely to match the design of the wall along the frontage of the site. The reason for the condition is :- In the interest of the visual amenities of the locality. |
| 4. | REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan. |