No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall not be commenced until such time as a scheme to separate the dirty water and slurry, and detailed plans including the location and size of the slurry lagoon, has been submitted to, and approved in writing by, the local planning authority. The scheme shall be implemented as approved. The reason for the condition is:- To ensure the development complies with the Nitrate Pollution Prevention Regulations 2008, to prevent pollution and protect the land and water environment.
3.The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) dated March 2009 and the following mitigation measures detailed within the FRA: 1 The finished floor level within the milking parlour shall be a minimum of 1.30mAOD as stated within section 13.1 of the submitted FRA. 2 Access and egress routes from the building shall be to the North-East of the site and evacuation of the site in a flood event via Main Road A1064 to the East. 3 ¿Clean yard¿ discharge shall be restricted from the site at 2l/s and 214m³ storage volume provided by the proposed balancing pond as detailed in Section 10 and 11 of the FRA submitted. 4 For runoff generated by the 918m² 'dirty yard' area during the 1 in 100 year rainfall event including climate change, the required 56m³ surface water storage shall be provided through the existing dirty water tank and proposed 60m³ overflow pit as outlined in supplementary information received 17 May 2009. The reason for the condition is:- 1 To minimise the effects of flooding within the development and ensure future occupants of the development are safe. 2 To provide safe access/egress during flood events and reduce reliance on emergency services as is set out in PPS 25 paragraph E.3. 3 To prevent the proposed development resulting in surface water flooding of the site or surrounding areas. 4 To prevent the proposed development resulting in surface water flooding of the site or surrounding areas.
4.Prior to the development hereby permitted commencing details of the design and siting of the attenuation pond to be constructed shall be submitted for the pproval of the Local Planning Authority in consultation with the Internal Drainage Board and all works shall be carried out in accordance with such details as may be agreed. The reason for the condition is :- Precise details had not been submitted as part of the application.
5.Prior to the commencement of the development herby permitted details shall be submitted for the approval of the Local Planning Authority of the external finishes of the timberwork on the building and works in accordance with such details as may be agreed shall be completed prior to the building first being brought into use. The reason for the condition is :- In the interests of the visual amenities of the locality.
6.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Government Guidance and Policy NNV18 and NNV16 of the Great Yarmouth Borough-Wide Local Plan.
7.Notes for the applicant:- Information for the applicant from the Environment Agency:- The effluent scheme should take account of the maximum size dairy herd that the development could expand to, to ensure continued compliance with the regulations if the herd is expanded. Under the terms of the Control of Pollution (Silage, Slurry and Agricultural Fuel Oils) Regulations 1991 and as amended 1997, the person who proposes to have control over any relevant storage installation is required to serve notice on the Environment Agency specifying the type of structure to be used and its location at least 14 days before it is to be used for the keeping or storing of any relevant substance. Any facilities, above ground, for the storage of oils, fuels or chemicals shall be provided with adequate, durable secondary containment to prevent the escape of pollutants. The bunded area shall be designed, constructed and maintained in order that it can contain a capacity not less than 110% of the total volume of all tanks or drums contained therein. All filling points, vents, gauges and sight glasses should be bunded. Any tank overflow pipe outlets shall be directed into the bund. Associated pipework should be located above ground and protected from accidental damage. There shall be no gravity or automatic discharge arrangement for bund contents. Contaminated bund contents shall not be discharged to any watercourse, land or soakaway. The installation must, where relevant, comply with the Control of Pollution (Oil Storage) (England) Regulations 2001 and the Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) Regulations 1991 and as amended 1997. Site occupiers intending to purchase or install pollutant secondary containment (bunding) should ensure that the materials are not vulnerable to premature structural failure in the event of a fire in the vicinity. NOTES - Please read the following notes carefully:-