| No. | Condition Text |
|---|
| 1. | No development whatsoever shall take place until full details of the appearance and landscaping of the development (herein after referred to as the reserved matters) have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 2. | Application for approval of reserved matters must be made not later than the expiration of three years beginning with the date of this permission and the development must be begun not later than the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
The reason for this condition:-
The time limit condition is imposed in order to comply with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 3. | The development in so far as it relates to the layout of the site shall be carried out in accordance with the revised plan received by the Local Planning Authority on 30th March 2009.
The reason for the condition is :-
For the avoidance of doubt and to ensure the satisfactory layout of the site. |
| 4. | All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever, is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 5. | The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) and the following mitigation measures detailed within the FRA:
1. Finished first floor levels must be no lower than 3.750mAOD, as stated in the submitted letter dated 27 February 2009, to provide refuge during flood emergencies in the unlikely event that the development has not been evacuated.
2. The proposed development shall adopt the submitted Flood Response Plan, which will be implemented on receipt of a flood warning. The escape route shall be from the site to Morton Peto Road above a level of 6.132mAOD as shown in Drawing Sk10.
3. In agreement with Point 3 of the letter dated 05 February 2009 and Pages 1-9 Rev: A of the Microdrainage Calculations submitted, surface water shall be attenuated and the proposed hydrobrake will limit discharge from Unit 1 at 10l/s and Units 2 and 3 at 5l/s, a total of 15l/s from the site overall.
The reason for the condition is:-
1. To ensure refuge is available to future occupants of the development in emergencies where flood warning has not been received or occupants are unable to be evacuated.
2. To ensure the safety of future occupants of the development.
3. To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site. |
| 6. | Prior to the commencement of development approved by this planning permission (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), the following components of a scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved, in writing, by the local planning authority:
1) A preliminary risk assessment which has identified:
all previous uses
potential contaminants associated with those uses
a conceptual model of the site indicating sources, pathways and receptors
potentially unacceptable risks arising from contamination at the site.
2) A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.
3) The site investigation results and the detailed risk assessment (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.
4) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.
Any changes to these components require the express consent of the local planning authority. The scheme shall be implemented as approved.
The reason for the condition is:-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters.
|
| 7. | Prior to commencement of development, a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved, in writing, by the local planning authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include a plan (a long-term monitoring and maintenance plan) for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification plan, and for the reporting of this to the local planning authority.
The reason for condition is:-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters.
|
| 8. | Reports on monitoring, maintenance and any contingency action carried out in accordance with a long-term monitoring and maintenance plan shall be submitted to the local planning authority as set out in that plan. On completion of the monitoring programme a final report demonstrating that all long- term site remediation criteria have been met and documenting the decision to cease monitoring shall be submitted to and approved in writing by the local planning authority.
The reason for the condition is:-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters.
|
| 9. | If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted, and obtained written approval from the Local Planning Authority for, an amendment to the remediation strategy detailing how this unsuspected contamination shall be dealt with.
The reason for the condition is:-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters.
|
| 10. | Prior to the commencement of any development, a scheme for the provision and implementation of pollution control shall be submitted to, and agreed in writing with, the Local Authority. The works/scheme shall be constructed and completed in accordance with the approved plans/specification at such time(s) as may be specified in the approved scheme.
The reason for the condition is:-
To ensure a satisfactory method of pollution control.
|
| 11. | Prior to the first occupation of the buildings hereby approved the proposed vehicular access shall be constructed in accordance with N.C.C. industrial access construction specification for the first 5.0 metres into the site as measured back from the near edge of the adjacent carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 12. | Prior to the commencement of the use hereby permitted the proposed access/on-site car and cycle parking/servicing/loading, unloading/turning/waiting area shall be laid out, demarcated in accordance with drawing no. PL.101 revB and surfaced and drained in accordance with details to be submitted to and agreed in writing with the Local Planning Authority and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the provision of adequate on-site parking and turning facilities for the development.
|
| 13. | The access shall be constructed with adequate drainage measures to prevent surface water run-off onto the adjacent public highway, in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority.
The reason for the condition is :-
To prevent extraneous material being deposited on the highway. |
| 14. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the requirements of Policy EMP2 in respect of commercial developments, shown as an allocation for employment land in of the Great Yarmouth Borough-Wide Local Plan. |
| 15. | NOTES - Please read the following notes carefully:-
Supplementary Information from the Environment Agency:-
The applicant should consider the following, as a minimum, when producing their scheme.
1) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. All washdown and disinfectant waters shall be discharged to the foul sewer. Any detergents entering oil separators may render them ineffective.
2) All cleaning and washing operations should be carried out in designated areas isolated from the surface water system and draining to the foul sewer (with the approval of the sewerage undertaker). The area should be clearly marked and a kerb surround is recommended.
3) Vehicles' loading or unloading bays and storage areas involving chemicals, refuse or other polluting matter shall not be connected to the surface water drainage system.
4) No foul sewage or trade effluent, including cooling water containing chemical additives, or vehicle washing water, including steam-cleaning effluent, shall be discharged to the surface water drainage system.
5) Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.
6) Any facilities, above ground, for the storage of oils, fuels or chemicals shall be provided with adequate, durable secondary containment to prevent the escape of pollutants. The bunded area shall be designed, constructed and maintained in order that it can contain a capacity not less than 110% of the total volume of all tanks or drums contained therein. All filling points, vents, gauges and sight glasses should be bunded. Any tank overflow pipe outlets shall be directed into the bund. Associated pipework should be located above ground and protected from accidental damage. There shall be no gravity or automatic discharge arrangement for bund contents. Contaminated bund contents shall not be discharged to any watercourse, land or soakaway. The installation must, where relevant, comply with the Control of Pollution (Oil Storage) (England) Regulations 2001 and the Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) Regulations 1991 and as amended 1997.
7) All drums and small containers used for oil and other chemicals shall be stored in bunded areas that do not drain to any watercourse, surface water sewer or soakaway.
8) Facilities should be provided to ensure that waste oil is stored and disposed of in a manner that will not lead to pollution. Site occupiers intending to purchase or install pollutant secondary containment (bunding) should ensure that the materials are not vulnerable to premature structural failure in the event of a fire in the vicinity.
continued:-
|
| 16. | Informative from Norfolk County Council:-
The development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority.
It is an offence to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group.
Public utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alteration, which have to be carried out at the expense of the developer.
A quotation for the works to be carried out within the Highway will be sent to you in due course. It is an offence to carry out works within the public highway, which includes a Public Right of Way, without the permission of the Highway Authority.
Advice on this matter can be obtained from the County Council's Highway Development Control Group. |