Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the revised plan (Drawing number PL15), as received by the local planning authority on 19/01/2009. The reason for the condition is :- For the avoidance of doubt.
3.Notwithstanding the notes on the submitted drawings, no development shall take place until: (a) specific constructional details, including structural engineer's designs for the roofspace floors, staircases and additional support to the exisitng roofs and: (b) precise details of the manufacturer (where appropriate) and types and colours of the internal and external materials and finishes to be used in the conversion and extension works hereby permitted have been submitted to an approved in writing by the Local Planning Authority. The reason for the condition is :- To enable the local planning authority to retain control over the development in order to preserve and enhance the character and appearance of the building and its setting.
4.No development shall take place until drawings and details of the materials, design and finishes of all extensions, roofs, dormers, doors and windows, soil and vent pipes, waste pipes and rainwater goods have been submitted to and approved in writing by the Local Planning Authority. The development shall becarried out in accordance with the approved details and shall thereafter be so maintained. The reason for the condition is :- To ensure that such items do not detract from the character and appearance of the building.
5.No painting of the external surfaces of the building, nor any repointing of the brickwork shall take place without the prior written consent of the local planning authority. Proposals shall be submitted to and approved in writing by the local planning authority before any work is begun and the work shall be carried out in accordance with the approved details. All rendering work to be carried out shall solely use hydraulic lime mortar and shall be agreed and carried out under the supervision of Great Yarmouth Borough Council Conservation Officers. The reason for the condition is :- To ensure such works do not detract from the character and appearance of the building.
6.No enlargement or other altreation to the extension hereby permitted shall be erected or carried out except in accordance with drawings showing the siting and design of such enlargement or alteration which shall previously have been submitted to and approved in writing byt the local planning authority. The reason for the condition is :- To ensure such development does not detract from the character and appearance of the building and its setting.
7.The new facing and repaired brickwork shall match the orignal historic brickwork in respect of colour, texture, bond and pointing, unless shown otherwise on the approved drawings or other documentation hereby approved or required by ant conditions attached to this consent. The reason for the condition is :- To ensure materials used are appropriate to the Listed Building.
8.All new external rain water goods and soil pipes on the visible elevations shall be of cast iron and painted black or another dark recessive colour to be agreed in writing with the local planning authority in conjunction with Conservation Officers. The reason for the condition is :- To ensure materials appropriate to the status of the building.
9.All new finishes and works of making good to the retained fabric, shall match the exisitng and original historic work with regard to the methods used and to the material, colour texture and profile, unless otherwise shown on the drawings or other documentation hereby approved or required by any condition(s) attached to this consent. The reason for the condition is :- To ensure materials appropriate to the Listed Building and to maintain the satisfactory appearance of the property.
10.Before any works are commenced, details of the following shall be submitted to and agreed in writing by the local planning authority: - a sample of the type of brick proposed - a description of the joints, mortar mix and finish - a sample panel of the brickwork which shall include snapped header brickwork - a sample of the roofing materials The reason for the condition is :- To ensure the materials and finish are appropriate to the buildings status as a listed building.
11.No development shall take place until there has been submitted to and approved by the local planning authority a scheme of hard and soft landscaping, which shall include all surfacing, walls and railings and full planting details. The reason for the condition is :- In the interests of the visual amenities of the area.
12.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particular, policies BNV5 and BNV6.