Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the application form, plan and drawings and other documents and details submitted or provided by the applicant as amended by drawing ref:704 2008-09 as received on 10 December 2008. The reason for the condition is :- For the avoidance of doubt and to ensure the satisfactory development of the site.
3.Prior to the commencement of the use hereby permitted a 2.4 metre wide parallel visibility splay shall be provided across the road frontage of the site. The reason for the condition is :- To maintain the safe and free flow of traffic.
4.Prior to the first commencement of the use hereby approved the proposed vehicular access shall be constructed in accordance with N.C.C. commercial access specification for the first 4.5 metres into the site as measured back from the near edge of the adjacent carriageway. The reason for the condition is :- In the interests of highway safety.
5.Prior to the first commencement of the use hereby approved the proposed private road and on-site parking area shall be laid out, demarcated, levelled, surfaced and drained and retained thereafter available for that specific use in accordance with the approved plan. No development shall take place until exact details of the surfacing materials to be used have been submitted to and approved in writing by the local planning authority. The reason for the condition is :- To ensure the provision of adequate on-site parking and turning facilities for the development.
6.The access shall be constructed with adequate drainage measures to prevent surface water run off. These details shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The reason for the condition is :- To ensure the highway remains free from obstruction and to prevent surface water flooding.
7.The proposed access barrier hereby approved shall be repositioned a minimum of 10 metres from the near edge of the highway carriageway. The reason for the condition is :- In order to prevent queing back from the entrance onto the public highway.
8.The access barrier/gate indiacted on the approved plan (drawing number 704 2008-09) shall be kept locked shut between the hours of 20:00 hours and 08:00 hours unless otherwise agreed in writing with the local planning authority. The reason for the condition is :- To maintain the safety of the site during night-time hours and to ensure the amenities of adjacent occupiers.
9.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping for the development hereby approved. These details shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.Any trees and shrubs so planted which dies within 3 years shall be replaced within one year by the applicants or their sucessors in title. The reason for the condition is:- In the interests of the visual amenities of the locality.
10.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particular, policies TR6, NNV2 and BNV1.