| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the first occupation of the building hereby permitted the on-site parking shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the facility in the interest of highway safety. |
| 3. | The development shall be constructed with a minimum floor level of 0.84m AOD.
The reason for the condition is :-
To ensure the appropriate protection to the development and its occupants as is set out in PPS25 Table D.1. |
| 4. | Prior to the commencement of any development, a flood response plan shall be submitted to and agreed in writing with the Local Planning Authority. This flood response plan shall incorporate the tidal curve by Scott Wilson (titled Wall 83C - Compartment C Great Yarmouth) as in the FRA dated 10th December 2007 and referenced 07200305WFR that shows appropriate evacuation times. This shall be made available to future occupants of the site by means of a fixed notice within the building prior to habitation.
The reason for the condition is :-
To ensure all users of the development are safe in the event of a flood as set out in PPS25 paragraph E.3. |
| 5. | The current and any subsequent owners, are responsible for erecting suitable permanent warning notices detailing the nature of the flood risk and the flood plan for this site. Furthermore, a fixed sign shall be permanently displayed at each entrance to the site giving this information. All signs shall be kept legible, clear of obstruction and up-to-date if flood risk information changes.
The reason for the condition is :-
To ensure that owners and visitors of the site are aware that the land is at risk of flooding. |
| 6. | Prior to the commencement of development, a scheme for the provision and implementation of flood proofing measures shall be submitted to, and agreed in writing with the Local Planning Authority. The scheme shall be carried out in its entirety before the development is first occupied and shall be constructed and completed in accordance with the approved plans and in line with the CLG publication "Flood Resilient Construction - Improving the flood performance of new buildings".
The reason for the condition is :-
To minimise the damage to the development in the event of flooding and enable a faster recovery once flood waters have subsided as set out in paragraph 5.41 of the PPS25 Practice Guide. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
In order to improve facilities for the College. |
| 8. | NOTES - Please read the following notes carefully:-
1) Any culverting or works affecting the flow of a watercourse requires the prior written consent of the Internal Drainage Board under the terms of the Land Drainage Act 1991/Water Resources Act 1991. Please contact the IDB in the first instance, if they do not wish to issue consent then please contact the Environment Agency.
2) The applicant's attention is drawn to the attached letter from Natural England and the need to comply fully with their requirements. |