| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the commencement of the development hereby permitted a schedule of works for soundproofing the flats shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Building Control Officer all works shall be completed in accordance with the scheme prior to the first occupation of the flats hereby permitted.
The reason for the condition is :-
To reduce impact and airborne noise transference between individual flats and the adjoining properties in the interests of the residential amenities of the adjacent occupiers. |
| 3. | Prior to the first occupation of the flats hereby permitted a fire detection and alarm system shall be installed in each flat. This detection system should consist of mains wired interlinked smoke alarms with integral battery back-up located in the living room, bedroom and hallway/lobby of each dwelling and an additional interlinked heat alarm with integral battery back-up located in the kitchen as a minimum.
The structure separating individual dwellings from each other and the communal areas shall offer a minimum of 30 minutes fire and smoke resistance. The entrance doors to each flat should be full FD30S type doors. The amin route of escape through the building shall be a 30 minute fire and smoke protected route.
The reason for the condition is :-
To enusre the safety of occupants in the event of fire. |
| 4. | Prior to the first occupation of the flats hereby permitted an adequate ventilation system must be provided to the bathrooms and kitchen. Any mechanical ventilation equipment must have a 'whisper-quiet' operation and meet with current Building Regulations.
The reason for the condition is :-
To ensure the amenities of adjacent occupiers by preventing noise polluyion from the flats. |
| 5. | No construction work shall take place on the site outside of the following hours:-
08:00 hours to 18:00 hours Monday to Friday
08:30 hours to 13:30 hours Saturdays
No work shall take place on Sundays or Bank Holidays
The reason for the condition is :-
To protect the residential amenities of adjacent residents. |
| 6. | No bins shall be stored on the public highway at any time (except when being collected). All bins shall be stored in a secure yard at the rear of the flats hereby permitted.
The reason for the condition is :-
To maintain free and safe passage of both pedestrians and vehicles on the public highway. |
| 7. | The applicants attention is drawn to the following advisory notes:
LOCAL AIR QUALITY
The site will potentially generate a significant amount of dust during the construction process, therefore the following measures should be employed:-
An adequate supply of water shall be available for supressing dust
Mechanical cutting equipment with integral dust supression should be used
There shall be no burning of any materials on site.
Please read the attached comments from Norfolk Constabulary. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of Polciy HOU23 of the Great Yarmouth Borough Wide Local Plan. |