Great Yarmouth Borough Council Portal
No.Condition Text
1.This permission expires on 6th August 2011 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the top and sub soil shall be removed from the site and the use shall cease. The reason for the condition is:- In accordance with the terms of the application and in the interests of the visual amenities of the locality.
2.The use shall be confined to the area specified and shown on the submitted and approved plan Drawings No. NHHY2/MS01 and NHHY2/MS01-01A-1 and prior to the development details of the siting of the soil heaps shall be submitted to and approved by the local planning authority.The location soil heaps shall accord with the approved details and at no time shall the heaps exceed 3 metres in height unless otherwise agrred in writing by the local planning authority. The reason for the condition is :- In accordance with the approved plans and the details submitted with the application.
3.Notwithstanding Condition 2 prior to the soil being deposited on the land a HGV routing Agreement between the applicant and the highway authority shall be instigated and a full photographic record of the proposed route along the public highway shall be provided before and after the duration of the works unless otherwise agreed in writing by the local planning authority. The reason for the condition is :- In the interests of highway safety.
4.The applicant shall fully reinstate any damage caused to the public highway by construction traffic to and from the application and development sites, to the satisfaction of the Highway Authority in consulation with the the LOcal Planning Authority, during and on completion of the proposed works. The reason for the condition: To avoid any permanent damaage to the highway surface.
5.The Reason for the Approval. It is considered by the local planning authority that subject the above conditions the use of the land for the period proposed and the near proximity of the local development sites is likely to have minimal impact upon local watercourses and of the wider highway network and neighbour amenity.
6.NOTES - Please read the following notes carefully:- The site is within a consultation zone for BPA pipeline this grant of planning permission does not grant consent for any wayleave consents that may be required under other unrelated legislation.