| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No development shall take place within the site until the applicant, or their agents or successors in title, has
a) caused to be implemented a programme of archaeological evaluation in accordance with a first written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority; and next
b) submitted the results of the archaeological evaluation to the local authority; and next
c) secured the implementation of a programme of archaeological mitigatory work in accordance with a second written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is :-
In order to enable investigation and recording of the site of archaeological interest to take place during the period of building or engineering work. |
| 3. | Notwithstanding the details on the submitted drawings precise details of materials to be used in the construction of the dwelling, in respect of the roof tiles, type and style of windows, doors and rainwater goods shall be submitted for the approval of the Local Planning Authority and works in accordance with such details as may agreed shall be carried out prior to the first occupation of the dwelling and thereafter maintained in accordance with the approved details.
The reason for the condition is :-
The details on the submitted drawing were not considered acceptable to the Local Planning Authority and in the interests of the visual amenities of the locality. |
| 4. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 ( or any order revoking and re-enacting that Order) the dwelling shall not be extended in any way without the prior consent of the Local Planning Authority.
The reason for the condition is:-
To enable the Local Planning Authority to retain control over any extensions to the dwellings in the interests of residential amenity. |
| 5. | No part of the proposed structure shall overhang or encroach upon highway land and no door shall open outwards over the public footway.
The reason for the condition is :-
To prevent obstruction of the public highway/footway in the interests of highway/footway safety.
|
| 6. | Prior to the first occupation of the dwelling hereby permitted the existing vehicular access to the public highway shall be fully reinstated, to include fuall upstand kerbing, to accord with NCC footway specification.
The reason for the condition is:-
In the interests of highway safety and to ensure the removal of the redundant pavement crossing. |
| 7. | Prior to any work coommencing on the dwelling hereby permitted precise details of a refuse bin storage area shall be submitted to and agreed with the Local Planning Authority and works in accordance with the approved details shall be completed prior to the first occupation of the dwelling and thereafter maintained.
The reason for the condition is :-
To ensure the provision of adequate refuse provision to serve the dwelling. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7, BNV9, BNV10 and BNV2 of the adopted Great Yarmouth Borough-wide Local Plan. |