1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out strictly in accordance with the drawing no.2432/6 and revised plans No.2432/1/5B and 7B and applicants letter received on 2April 2008. The reason for the condition is :- For the avoidance of doubt and in accordance with the submitted plans.
3.Not withstanding the submitted drawings,prior to the commencement of development a full schedule of works including materials and internal and external finishes shall be submitted to and agreed in writing by the Local Planning Authority; the development shall then be carried out in accordance with the agreed details and retained in the approved condition thereafter. The reason for the condition is :- Because the precise details of materials have not been submitted as part of the application.
4.Notwithstanding the submitted plans prior to the commencement of development precise details of the new roof form and framing, windows and doors (which shall be of timber construction unless otherwise agreed by the Local Planning Authority) in the form of 1-5 and half size drawings shall be submitted to and agreed in writing by the Local Planning Authority. The reason for the condition is :- To ensure materials that are compatible with and enhance the appearance of the Building.
5.Notwithstanding the submitted plans prior to the commencement of the development comprehensive details of the access provision for those with physical and sensory disibilities to and within the complex shall be submitted to and agreed in writing by the local planning authority. The reason for the condition is :- To ensure appropriate services and facilities for people with disbility are included in a manner that is Compatible with the building's materials and design.
6.Before any works are commenced, details of the following - for the extension- shall be submitted to and and agreed in writing, by the Local Planning Authority: -a sample of the type of brick proposed; -a sample panel of the wall and roof coverings which shall include snapped header face work - a description of the joints proposed which shall include white cement mortar mix, profile and finish. -a method statement for thatch repair/reinstatement The reason for the condition is :- To ensure that the materials and finish is appropriate to the building's status.
7.The position, type and method of all new and relocated services and related fixtures ( for the avoidance of doubt including extracts (and linings), or other appurtenances, shall be specified in advance of any work being carried out , and the prior approval of the Borough Council as the Local Planning Authority shall be obtained wherever these works are to be visible, or where ducts or other methods of concealment are proposed. Any works shall be carried out in accordance with such approval. The reason for the condition is :- Beause of the exposed island nature of the site.
8.Notwithstanding the submitted plans, details of the new bridge, improvements to the terraces,improvements to the paths and boundary enclosure and techniques and form of construction,including the depth of excavation and materials to be used,shall be submitted to and agreed in writing by the Local Planning Authority prior to any works to the site are commenced. The reason for the condition is :- Because the precise details have not been submitted.
9.Prior to the commencement of work on site a detailed timetable for the construction work on site shall be submitted for the approval of the Local Planning Authority and the timetable of work shall ensure that all major construction work is completed by April in any year. The reason for the condition is :- To avoid disturbance to the collony of nesting little terns within the North Denes Site of Special Scientific Interest.
10.No construction work shall be carried out on the development hereby permitted during the period April to August in any year. The reason for the condition is :- To ensure that the construction work does not adversely effect the little tern colony in the adjacent Site of Special Scientic Interest.
11.The use of the restaurant and bar hereby permitted shall not be open to customers outside the following times 09.00hours to 023.00 hours on any day. The reason for the condition is :- In the interests of the amenitioes of the occupiers of nearby properties.
12.A flood evacuation plan shall be submitted to and agreed in writing with the local planning authority. This flood evacuation plan shall be implemented in the event of a severe flood warning, as stated in the Flood Risk Assessment sections 5.4 and 7.1. The reason for the condition is :- To minimise the risks to people in a flood event.
13.The finished floor levels of the development shall be set no lower than the existing floor levels and the minimum level of 2.96mAOD, as per section 6.1 of the Flood Risk Assessment. The reason for the condition is :- To minimise the impacts of a flood event.
14.Floodproofing techniques and measures shall be incorporated into the construction of the development, as per the section 6.2 of the Flood Risk Assessment. This should be implemented in accordance with the new communities and Local Government Document 'Improving the Flood Performance of New Buildings- 'Flood Resillient Construction' The reason for the condition is :- To reduce the impacts of a flood event.
15.No part of the proposed structure shall overhang or encroach upon highway land and no door shall open outwards over the public footway. The reason for the condition is :- To prevent obstruction of the public highway/footway in the interests of highway/footway safety.
16.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development. The reason for the condition is:- In the interests of the visual amenities of the locality.
17.The Reason for the Approval. The Local Planning Authority considers that subject to the above conditions that the the proposals comply with the aims of Policy NNV10,BNV5,BNV18 and TR21 of the Great Yarmouth Borough Wide Local Plan 2001.