| No. | Condition Text |
|---|
| 1. | This permission expires on 31st March 2018 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the building shall be removed from the site.
The reason for the condition is:-
In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality. |
| 2. | Finished floor levels shall be set at a minimum level of 0.62metres AOD (the combined 1:100 year fluvial and 1:200 year tidal flood events, inclusive of an allowance for the impacts of climate change and a freeboard of 150mm).
The reason for the condition is :-
To reduce the flood risk to the development. |
| 3. | In accodance with FRA section 6.2, flood proofing techniques and materials shall be incorporated into the development.
The reason for the condition is :-
To reduce the impacts of a flood event. |
| 4. | In accordance with FRA section 6.3, the portacabin shall be securely anchored to the ground.
The reason for the condition is :-
To prevent the Portacabin becoming buoyant during a flood event. |
| 5. | A flood evacuation plan shall be submitted to, and agreed in writing, with the Local Planning Authority before first use of the development.
The reason for the condition is :-
To minimise the flood risk to people. |
| 6. | Prior to building being located on the site revised siting details shall be submitted to take account of the comments in the agent's letter of 21st February 2008 to ensure the provision of a 9 metre distance between the proposed building and the watercourse to the north of the proposed building.
The reason for the condition is :-
To ensure the provision of an adequate area to enable maintenance of the drainage dyke to take place. |
| 7. | Prior to the building being located on the site details shall be submitted of surface water disposal disposal and the position of any soakaway, subject to the results of a percolation test, shall be submitted for the approval of the Local Planning Authority and all works shall be carried out in accordance with such details as may be agreed.
The reason for the condition is :-
Precise detail have not been submitted and details have not been agreed with the Internal Drainage Board. |
| 8. | The offices hereby permitted shall only be used in conjunction with the operation of the heliport unless otherwise agreed in writing with the Local Planning Authority.
The reason for the condition is :-
The site is outside any area allocated for such uses in the Borough Wide Local Plan unless used in conjunction with the heliport. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the requirements of Policy TCM21 of the Great Yarmouth Borough-Wide Local Plan in respect of improvements to facilities at North Denes Airfield. |
| 10. | NOTES - Please read the following notes carefully:-
The applicant is reminded of the need to obtain the consent of the Internal Drainage Board in respect of the surface water disposal from the site and ensure compliance with their byelaws as set out in the letter dated 31st January 2008 previously sent to the agent.
The applicant is reminded that this permission does not purport to convey permission for the laying out of the car park which will require the consent of the Local Planning Authority. |