| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No part of the proposed structure shall overhang or encroach upon the highway boundary.
The reason for the condition is :-
In the interests of highway safety. |
| 3. | The roller shutter shall be installed so no part of any box housing of the installation projects out in front of the line of the existing facsia of the shop front.
The reason for the condition is :-
In the interests of the visual amenities of the area and to ensure the development takes place in the manner contemplated on the grant of this permission. |
| 4. | The roller shutter shall be finished in a colour to match the existing external decor of the shop front and shall not be changed in any way without the prior consent in writing of the Local Planning Authority.
The reason for the condition is :-
To ensure the development takes place in a manner contemplated by the Local Planning Authority on the grant of this permission and in the interests of the visual amenities of the area. |
| 5. | REASON FOR APPROVAL OF THE APPLICATION:-
The proposal meets the criteria for alterations and extensions to buildings set out in Policy BNV18 of the adopted Great yarmouth Borough-Wide Local Plan. |