| No. | Condition Text |
|---|
| 1. | This permission expires on 19th October 2012 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the buildings shall be removed from the site.
The reason for the condition is:-
In order to retain control over the buildings which are constructed of short lived materials and in the interests of the visual amenities of the locality. |
| 2. | The dwelling shall be constructed with a minimum finished floor level of 1.39mAOD.
The reason for the condition is :-
To ensure that the development remains dry in the event of flooding for the adequate protection of the occupants as set out in PPS25 Table D.1. |
| 3. | Prior to the commencement of development, a scheme for the provision and implementation of flood proofing measures shall be submitted to and agreed, in writing, with the Local Planning Authority. The scheme shall be carried out in its entirety before the development is first occupied and constructed and completed in accordance with the approved plans and in line with the CLG Document 'Flood Resilient Construction - Improving the Flood Performance of New Buildings'.
The reason for the condition is :-
To minimise the damage to the development in the event of flooding and enable a faster recovery once floodwaters have subsided as is set out in PPS25 paragraph D.17. |
| 4. | Flood warning notices shall be erected in numbers, positions and with wording to be agreed with the Local Planning Authority. The notices shall be kept legible and clear of obstruction.
The reason for the condition is :-
To ensure that occupants of the development are aware that the site is at risk of flooding as is set out in PPS25 paragraph E.3. |
| 5. | Prior to the occupation of this development, a flood response plan shall be submitted to, and agreed in writing with, the Local Planning Authority. Once agreed this shall form part of the Health and Safety File for the building, under the Construction, Design and Management (CDM) Regulations.
The reason for the condition is :-
To ensure that the owners and visitors of the site are aware that the land is at risk of flooding and that the flood plan information is passed onto any subsequent owners of the building. |
| 6. | Prior to the commencement of development, a scheme detailing the anchorage of the temporary building in the area delineated in the Environment Agency's flood zone map shall be submitted to, and agreed in writing with, the Local Authority. The works/scheme shall be constructed and completed in accordance with the approved plans/specifications prior to occupation of the building.
The reason for the condition is :-
To ensure that in the event of flooding, the anchorage of the structure will prevent it from becoming buoyant and floating off site. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of Policy EMP15 of the Great Yarmouth Borough-Wide Local Plan. |