| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the commencement of the development hereby permitted details shall be submitted for the approval of the Local Planning Authority for obscure glazing to be installed in the sides of the second floor conservatory and the glazing works in accordance with such details as may be agreed shall be completed prior to the extension hereby permitted first being brought into use and maintained as such thereafter.
The reason for the condition is :-
In the interests of the amenities of the occupiers of nearby residential properties. |
| 3. | No work shall commence until the exact type and colour of the materials have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of the materials have not been submitted. |
| 4. | Prior to the commencement of any development, a scheme for the provision and implementation of flood proofing techniques shall be submitted and agreed in writing with the Local Planning Authority. The works shall be constructed and completed in accordance with the approved plans and in accordance with ODPM guidance 'Preparing for Floods' anf CLG document Improving the flood performance of new buildings.
The reason for the condition is :-
To minimise the damage to property in the event of flooding. |
| 5. | The development shall be constructed with a minimum finished floor level no lower than existing levels.
The reason for the condition is :-
To minimise the damage to property in the event of flooding. |
| 6. | Details of foul and surface water drainage for the site shall be submitted to and approved by the Local Planning Authority before any work commences. The drainage works shall be constructed in accordance with the approved plans.
The reason for the condition is :-
To ensure satisfactory drainage of the site and to prevent flooding. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for alterations and extensions to buildings set out in Policy BNV18, BNV10 and HOU21 of the adopted Great Yarmouth Borough-wide Local Plan |
| 8. | NOTES - Please read the following notes carefully:-
Anglian Water Services advise that the 300mm diameter combined sewer will require a minimum 3 metres clearance from any proposed works. For further information please contact developerservices@anglianwater.co.uk |