Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The buildings hereby permitted shall be sited in accordance with the details indicated on the revised plans received by the Local Planning Authority on 13th September 2007. The reason for the condition is :- For the avoidance of doubt.
3.The buildings hereby permitted shall not be brought into use until the external face of the concrete wall panels have been painted in a colour to be agreed in writing with the Local Planning Authority. The reason for the condition is :- This is a publicly visible site where appropriate materials are a visually essential requirement.
4.The existing 2.4 metre x 70 metre visibility splays at the junction of the access track and Rollesby Road shall be maintained clear of all planting/obstructions in excess of 600mm above ground level (with the exception of the existing mature trees). The reason for the condition is :- In the interests of highway safety.
5.REASON FOR APPROVAL OF THE APPLICATION :- The proposal is consistent with Policies NNV2, NNV5 and NNV18 of the adopted Great Yarmouth Borough-Wide Local Plan.