Great Yarmouth Borough Council Portal
No.Condition Text
1.This permission expires on 29th November 2007 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the portakabins shall be removed from the site. The reason for the condition is:- In order to retain control over the buildings which are constructed of short lived materials and not to prejudice the implementation of the Urban Regeneration Area Action Plan.
2.Prior to the commencement of the development, a flood response plan shall be submitted to and agreed in writing with the Local Planning Authority. This flood response plan shall include a statement which ensures that, as a minimum, the approved Flood Plan shall be implemented in the event of a severe flood warning being issued. This flood response plan should be made available to future occupiers/users of the site by means of a fixed notice within the portakabin offices prior to habitation. The reason for the condition is :- To minimise the risk to the occupants in the event of flooding.
3.Permanently fixed signs shall be erected and displayed at each entrance to the site giving information regarding the flood risk posed and the on-site evacuation procedures in place. All signs shall be kept legible, clear of obstruction and up to date if flood risk information changes. The reason for the condition is :- To ensure that the owners and visitors to the site are aware that the land is at risk of flooding.
4.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Policy EMP15 of the Great Yarmouth Borough-Wide Local Plan.
5.NOTES - Please read the following notes carefully:- (a) Under the terms of the Water Resources Act 1991 and the Land Drainage Byelaws, the prior written consent of the Environment Agency is required for any proposed works or structures either affecting or within 9 metres of the tidal or fluvial flood defence. (b) The Port Authority stipulates that, for navigational safety, any lights facing the quay frontage which may be visible from the river shall not create glare and shall not be capable of being mistaken for any form of navigational lights, i.e. by displaying red, green or flashing lights.