No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 27th November 2006. The reason for the condition is :- For the avoidance of doubt.
3.No development shall take place until full details of the materials to be used in the construction of the external surfaces, including details of rainwater goods and windows of the dwellings hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. The reason for the condition is :- Full details have not been submitted as part of the application and in the interests of the appearance of the development.
4.No part of the proposed structure shall overhang or encroach upon highway land and no door shall open outwards over the public footway. The reason for the condition is :- To prevent obstruction of the public highway in the interests of highway safety.
5.No development shall take place within the site until the applicant, or their agents or successors in title, has: a) caused to be implemented a programme archaeological evaluation in accordance with a first written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority; and next b) submitted the results of the archaeological evaluation to the Authority; and next c) secured the implementation of a programme of archaeological mitigatory work in accordance with a second written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority; and next, if the mitigatory work consists of further excavation d) a formal legal contract with an archaeological contractor has been submitted to and approved in writing by the Local Planning Authority. Such a contract will deal with all the details contained in the approved detailed second written scheme of investigation including post-excavation assessment, analysis, archiving and publication of results. The reason for the condition is :- In order to enable investigation and recording of this site of archaeological interest to take place during the period of building or engineering works.
6.No works shall commence on site until such time as details of the slab levels of the dwellings in relation to existing ground levels have been submitted to and approved by the Local Planning Authority. The reason for the condtions is:- To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site.
7.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 ( or any order revoking and re-enacting that Order) the dwellings shall not be extended in any way nor any further windows or openings shall be formed in the walls or roof of the building (other than those expressly granted consent by this permission) without the prior consent of the Local Planning Authority. The reason for the condition is:- To enable the Local Planning Authority to retain control over any extensions to the dwellings in the interests of residential amenity.
8.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan