| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 26th February 2007.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No work shall commence until the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of these materials have not been submitted. |
| 4. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no extensions shall be built or windows or other openings inserted into the walls or roof of the dwellings without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent property. |
| 5. | Notwithstanding the provisions of Class E of Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no buildings shall be erected within the curtilage of either of the dwellings hereby approved without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent property. |
| 6. | No development shall take place until a 2m wall or close boarded fence has been erected along the north and east boundaries of the site.
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of adjacent dwellings. |
| 7. | Prior to the first occupation of the dwellings hereby approved the proposed on-site parking area shall be laid out, demarcated and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the provision of adequate on-site parking facilities for the development. |
| 8. | The proposed boundary walls, positioned along the roadside curtilage of the site, shall be restricted to a maximum of 750mm in height above the level of the highway carriageway and shall be maintained not exceeding this height thereafter.
The reason for the condition is :-
In the interests of highway safety. |
| 9. | Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates shall be erected across the vehicular access.
The reason for the condition is :-
In the interests of highway safety. |
| 10. | No part of the proposed structure shall overhang or encroach upon highway land and no door or window shall open outwards over the public highway.
The reason for the condition is :-
To prevent obstruction of the public highway in the interests of highway safety. |
| 11. | Prior to the commencement of the development approved by this planning permission (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), a scheme to deal with the risks associated with contamination of the site shall be submitted to and approved in writing by the Local Planning Authority. That scheme shall include all of the following elements unless specifically excluded, in writing, by the Local Planning Authority.
1. A desk study identifying:
a) all previous uses
b) potential contaminants associated with those uses
c) a conceptual model of the site indicating sources, pathways and receptors
d) potentially unacceptable risks arising from contamination at the site
2. A site investigation scheme based on (1) to provide information for an assessment of the risk to all receptors that may be affected, including those off site.
3. The results of the site investigation and risk assessment (2) and a method statement based on those results giving full details of the remediation measures required and how they are to be undertaken.
4. A verification report on completion of the works set out in (3) confirming the remediation measures that have been undertaken in accordance with the method statement and setting out measures for maintenance, further monitoring and reporting.
Any changes to these agreed elements will require the express consent of the Local Planning Authority.
The reason for the condition is :-
To ensure that the development complies with approved details in the interests of protection of controlled waters. |
| 12. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan |