| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with Drawings Nos.RB05/715 and site plan both received by the local planning authority on 16th April 2006 and the detail thereon.
The reason for the condition is :-
For the avoidance of doubt and in accordance with the submitted application. |
| 3. | Prior to the new office and workshop first being brought into use the existing building shall be demolished and removed from the site and the ground made good in accordance with details to be submitted to and agreed by the local planning authority prior to the development approved by this permission commencing.
The reason for the condition is :-
In accordance with the terms of the application and to ensure that the land and building is cleared without detriment to the Broadland landscape. |
| 4. | Prior to commencement of any development details of the colour and profile of the external walls and roof,doors and windows of the building shall be submitted to and agreed in writing by the local planning authority.
The reason for the condition is :-
Because the precise details have not been submitted and agreed.
|
| 5. | No external floodlights shall be erected on the exterior of the building without the prior written consent of the local planning authority.
The reason for the condition is :-
The site is located in a sensitive area within the Broads Authority. |
| 6. | Details of the surfacing of the access road and parking areas shall be agreed by the Local Planning Authority before any work commences on the site.
Reason for the condition is:-
To ensure that the development is satisfactorily completed. |
| 7. | A scheme of landscaping comprising native species shall be implemented south of the building hereby approved, the details of which shall be submitted to and agreed in writing by the local planning authority prior to the development commencing and the scheme shall be completed prior to the first occupation of any of the building unless otherwise agreed in writing by the local plannimg authority. Any trees or shrubs which die, are removed, become seriously damaged or diseased shall be replaced within the next planting season with others of similar size and species, unless the Local Planning Authority agree in writing to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality |
| 8. | The development shall be constructed with a minimum finished floor level of 1.8m AOD.
The reason for the condition is :-
To ensure that the flood risk to the development and occupants in accordance with the submitted Flood Risk Assessement, ref:5376 dated April 2006. |
| 9. | Prior to the commencement of development, a scheme for the provision and implementation of flood proofing techniques shall be submitted to and agreed in writing by the Local Planning Authority. The scheme shall be carried out in their entirety before the devlopment is first occupied and constructed and completed in accordance with the approved plan and in line with the ODPM publication'Preparing for Floods'. As a minimum the recommendations of paragraph 9.1 of the submitted Flood Risk Assessment, ref 5376 dated April 2006 should be incorporated into the design
The reason for the condition is :-
To minimise the damage to the development in the event of flooding and enable a faster recovery once waters have subsided. |
| 10. | A flood evacuation plan shall be submitted and agreed, in writing with the local planning authority before occupancy of any part of the proposed development.
The reason for the condition is :-
To minimise the risk to occupants in the event of flooding. |
| 11. | Flood warning notices shall be erected in numbers, positions and wording to be agreed in writing with the local planning authority.The notices shall be kept legible and clear of obstruction.
The reason for the condition is :-
To minimise the risk to staff and visitors to the site in the event of flooding. |
| 12. | The Reason for the Approval.
The Local Planning Authority considers that the proposal complies with Policy C8 and INF2 of the Broads Local Plan 1997. |
| 13. | NOTES - Please read the following notes carefully:-
a) Please note that any works in, under,over or within 9 metres of the Rivers edge or designated Flood Defence will also equire the written consent of the Environment Agency under the terms of the Water Resources Act 1991. Further Information of this process can be obtained from John Abraham, Development Control Engineer, on (01473) 706545.
The existing building is shown as being on land owned by the Environment Agency. Before any works may take place, includiong demolition works of existing buildings, formal written agreement may be required under the terms of the lease. Please write to George Shelton ,Regional Estates Manager,at Environment Agency, Kingfisher House, Goldhay Way,Orton Goldhay,Peterborough, Cambridgeshire, PE2 5ZR with details and location of the propoed works.
b) The Broads navigation officer should be contacted prior to any works commencing as this notice grants planning consent only for the works. |