| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the Drawing Nos:06040300:01/P1,02/P1,03/P2,04/P1,05/P1,06/P1,07/P1 . and the content thereon.
The reason for the condition is :-
For the avoidance of doubt and in accordance with the submitted details. |
| 3. | The position, type and method of all new and relocated services and related fixtures ( for the avoidance of doubt including communications and information technology servicing ), or other appurtenances, shall be specified in advance of any work being carried out , and the prior approval of the Council as Local Planning Authority shall be obtained wherever these works are to be visible, or where ducts or other methods of concealment are proposed. Any works shall be carried out in accordance with such approval.Particular regard should be given to work affecting the following features or parts of the building:
a.timber frame components
The reason for the condition is:-
To protect the historic fabric of the building. |
| 4. | In the event that any hidden historical features are revealed during the course of the works, work shall be suspended in the relevant area of the building and the Council shall be notified immediately. Provision shall then be made for their retention and/or proper recording as required by the Council. Particular regard shall be paid to the extensions.
The reason for the condition is:-
To ensure an appropiate record is made of any fabric of architectural/historical/archaelogical significance in accordance with Policy BNV5 of the Great Yarmouth Local Plan 2001. |
| 5. | No repointing or painting of brickwork is authorised by this consent without prior approval of details. Proposals shall be submitted to and approved by the Local Planning Authority before the work is begun and the work carried out in accordance with the such approved details.
The reason for the condition is:-
To ensure that the type and mix used is appropriate to the buildings. |
| 6. | The new facing brickwork shall match the original historic adjacent brickwork in respect of colour,texture,face bond and pointing, unless shown otherwise on the approved drawings or other documentation hereby approved or required by any condition(s) attached to this consent.
The reason for the condition is:-
To ensure materials compatible with the existing building. |
| 7. | The new joinery shall of painted timber and match the the existing joinery adjacent in respect of materials,dimensions and profiles, unless otherwise shown on the approved drawings or other documentation hereby approved or required by any condition(s) attached to this consent.
The reason for the condition is :-
As condition 6. |
| 8. | Notwithstanding condition 2 above, No work shall commence on the shop front until a full detailed design of the shop front in the form of a 1:20 drawing has been submitted to and agreed in writing by the LOcal Planning Authotity.
The reason for the condition is :-
Because the precise details have not been submitted an agreed. |
| 9. | All new external rain water goods and soil pipes on the visible elevations shall be of cast iron,painted black.
The reason for the condition is :-
To ensure materials appropriate to the status of the building. |
| 10. | All new and/or internal works and finishes and works of making good to the retained fabric,shall match the existing original historic work with regard to the methods use and to the material,colour,texture and porofile,unless otherwise shown on the dawings or other documentation hereby approved or required by any condition(S) attached to this consent.
The reason for the condition is :-
To ensure materials appropriate to the Listed building. |
| 11. | No part of the proposed structure shall overhang or encroach upon highway land and no door shall open outwards over the public footway.
The reason for the condition is :-
To prevent obstruction of the public footway in the interests of footway safety.
|
| 12. | The Reason for the Approval.
The local planning authority considers that subject to the above conditions the proposals complies with Policy BNV5 and BNV6 of the Great Yarmouth Borough Wide LOcal Plan 2001. |