Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.No development shall take place until: (a) details of the exact type and colour of the materials to be used in the construction of/alteration to the external surfaces of the buildings, (b) the constructional details, materials and finishes of all external window/door joinery, (c) details of all soil and vent pipes, waste pipes and rainwater goods, and (d) details of the materials and finishes for all external hard surfacing adjacent to the buildings have been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development in order to ensure such items do not detract from the appearance and character of the buildings. continued on next page :-
3.No development shall take place until a scheme indicating the provision to be made for the visual screening of the proposed oil tank shown on Drawing No. 7.003 has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented before the tank is brought into use or in accordance with a timetable agreed in writing with the Local Planning Authority. The reason for the condition is :- To ensure the proposed oil tank does not detract from appearance and character of the buildings.
4.The workshop, boat storage area and garage shall only be used for private domestic use in connection with the dwelling to which they relate. The reason for the condition is :- In the interests of the residential amenities of the area.
5.REASON FOR APPROVAL OF THE APPLICATION :- The proposal satisfies the requirements of Policies HOU18, BNV10 and BNV18 of the adopted Great Yarmouth Borough-Wide Local Plan.