No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The new vehicular/pedestrian/cyclist access shall be formed in the position shown on drawing 02 rev P3 and shall be constructed in accordance with Norfolk County Council specification for the first 10.5 metres into the site, as measured from the nearer highway channel. The reason for the condition is :- To ensure satisfactory access into the site.
3.Vehicular/pedestrian/cyclist access to and egress from Suffolk Road shall be limited to the access shown on drawing 02 rev P3 only. Any other accesses/egresses shall be permanently closed and the footway/highway verge reinstated in accordance with a detailed scheme to be agreed with the Local Planning Authority in consultation with the Highway Authority, concurrently with the bringing into use of the new access. The reason for the condition is :- In the interests of highway safety.
4.Prior to the first use of the access hereby permitted visibility splays of 90m x 4.5m x 90m shall be provided. The splays shall thereafter be maintained free from any obstruction exceeding 0.225m above the level of the adjacent carriageway. The reason for the condition is :- In the interests of highway safety.
5.No works shall commence until a detailed scheme for the off-site highway improvement works as indicated on drawing 02 rev P3 has been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway improvement works are designed to an appropriate standard in the interest of highway safety and to protect the environment of the local highway corridor.
6.Prior to the first use of the new access, the off-site highway improvement works, referred to in condition 5, shall be completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway network is adequate to cater for the development.
7.No development shall take place until full details of the size, siting, floodlighting, fencing, parking and hours of use of the all weather pitch have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- Such details have not been submitted as part of this application.
8.NOTES - Please read the following notes carefully:-
9.It is an OFFENCE to carry out any works on the Public Highway without the permission of the Highway Authority. This development involves work to the public highway that can only be undertaken by the County Council within the scope of a legal Agreement with the applicant. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Engineer for Major Developments Mr M Rayner at County Hall in Norwich (tel. 01603 223273).