No.Condition Text
1.This permission expires on 22nd March 2007 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the building shall be removed from the site. The reason for the condition is:- In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality.
2.The minimum finished floor levels shall be set at, or above, 3.650m AOD. The reason for the condition is :- To ensure the appropriate protection to the building and its occupants as recommended by the submitted flood risk assessment.
3.Prior to the commencement of any development, a scheme for the provision and implementation of flood proofing techniques to a level of 4.25m AOD shall be submitted to and agreed in writing with the Local Planning Authority. The works shall be constructed and completed in accordance with the approved plans and in accordance with ODPM guidance 'Preparing for Floods'. As a minimum, the methods advised in recommendation number three of section 5.0, 'Conclusions and recommendations' of the submitted flood risk assessment (reference no. 06002200YFR) should be built in to the development. The reason for the condition is :- To minimise the damage to property in the event of flooding in accordance with the recommendations of the flood risk assessment.
4.Prior to the commencement of any development, a flood response plan shall be submitted to and agreed in writing with the Local Planning Authority. This flood response plan shall be made available to the occupiers/users of the site by means of a fixed notice within the building prior to occupation. The reason for the condition is :- To minimise the risk to the occupants in the event of flooding in accordance with the recommendations of the flood risk assessment.
5.Prior to the commencement of development, a scheme detailing the anchorage of the temporary buildings in the area delineated in the Environment Agency's flood zone map shall be submitted to and agreed in writing with the Local Planning Authority in consultation with the Environment Agency. The works/scheme shall be constructed and completed in accordance with the approved plans/specifications prior to occupation of the building. The reason for the condition is :- To minimise the risk to occupants and buildings both on and off-site in the event of flooding.
6.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Policy EMP15 of the Great Yarmouth Borough-Wide Local Plan.