| No. | Condition Text |
|---|
| 1. | This permission expires on 10th February 2011 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the portakabin shall be removed from the site and the use as an outdoor training area shall be discontinued.
The reason for the condition is:-
In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality. |
| 2. | Prior to the first commencement of the use hereby approved an on-site parking area consisting of three spaces shall be laid out, demarcated, levelled, surfaced and drained and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the provsion of adequate on-site parking and turning facilities for the development. |
| 3. | The floor level of the portakabin shall be set at, or above, 2.0m AOD.
The reason for the condition is :-
To ensure the appropriate protection to the building and its occupants. |
| 4. | Prior to the commencement of any development, a flood response plan shall be submitted to and agreed in writing with the Local Planning Authority. This flood response plan shall be made available to the occupiers/users of the site by means of a fixed notice within the building prior to occupation.
The reason for the condition is :-
To minimise the risk to the occupants in the event of flooding in accordance with the recommendations of the flood risk assessment. |
| 5. | Prior to the commencement of development, a scheme detailing the anchorage of all temporary buildings in the area delineated in the Environment Agency's flood zone map shall be submitted to and agreed in writing with the Local Planning Authority in consultation with the Environment Agency. The works/scheme shall be constructed and completed in accordance with the approved plans/specifications prior to occupation of the building.
The reason for the condition is :-
To minimise the risk to occupants and buildings both on and off-site in the event of flooding. |
| 6. | REASON FOR APPROVAL OF THE APPLICATION :-
In the interest of improving facilities at the training centre. |