| No. | Condition Text |
|---|
| 1. | Particulars of planning permission reserving details for approval:- Application No.:-06/97/0638/O varied by 06/03/0060/F for Residential Development
Particulars of details submitted for approval:- Siting,Design and External Appearance. |
| 2. | The layout of the development shall be carried out in accordance with the Drawings No.S200_03 Revision F amended 23 July 2007 and the detail thereon.
The Dwelling types shall accord with the 'House Type Schedule on plan S200_03 Revision F.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | There shall be no access to construction traffic from West Rd Caister and no works shall commence on the site until such time as a construction management plan has been submitted and approved by the Borough Council in consultation with the Highway Authority. Such a plan should include details of a Haul Road to the A149 (Caister Bypass) and any associated traffic management that is deemed necessary.
The reason for the condition is :-
In the interests of the residential amenity of the area and highway safety. |
| 4. | None of the dwellings adjacent to the boundaries of the site shall first be occupied until details of the means of enclosure along the adjacent boundary have been submitted for the approval in writing of the Local Planning Authority and the approved details have been implemented.
The reason for the condition is :-
In the interests of the amenities of occupiers of property adjoining the application site. |
| 5. | No dwelling shall be occupied until the garage relating to that dwelling has been completed and thereafter no business or commercial activity shall be carried out within or from that garage.
The reason for the condition is :-
To ensure that the development is satisfactoirily completed and in the interests of the residential amenities of the area. |
| 6. | During the course of the construction hereby approved, HGV wheel washing facilities shall be provided, details of which shall be submitted to and approved by the Local Planning Authority. The approved facilities shall be retained in the agreed location until the development is completed,unless otherwise agreed in writing by the Local Planning Authority.
The reason for the condition is:-
To prevent mud and debris from being deposited on the existing road network. |
| 7. | Prior to the first occupation of the development hereby permitted a visibility splay measuring 4.5 x 90 metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interest of highway safety. |
| 8. | No works shall commence on site until a detailed scheme for the off-site highway improvement works as indicated on drawing number S200-120 have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
In the interest of highway safety |
| 9. | Prior to the first occupation of the development hereby permitted the off-site highway improvement works referred to in Condition 7 of this planning permission shall be completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 10. | No works shall commence on the site until the Traffic Regulation Order for a waiting restriction on the south side of West Road between the site access and High Street has been secured by the Highway Authority.
The reason for the condition is :-
In the interest of highway safety. |
| 11. | Details of foul and surface water drainage for the site shall be submitted to and approved by the Local Planning Authority before any work on the site commences. The drainage works shall be carried out in accordance with the approved plans.
The reason for the condition:
To ensure satisfactory drainage of the site.
|
| 12. | No work shall take place outside the following hours;-
Monday to Friday 08.00 to 17.30
Saturday 08.00 to 13.00
No work on Sundays or Bank Holidays.
If piling is required, the quietest appropriate method shall be employed. Piling shall not be carried out outside the following hours:-
Monday to Friday 09.00 to 17.00
Saturday 09.00 to 13.00
to No piling on Sundays or Bank Holidays.
unless overwise agreed in writing by the local planning authority
The reason for the condition is :-
To protect the residential amenity of the occupiers of the nearby residential properties. |
| 13. | Prior to the commencement of the development full details of the public areas including surface treatment, means and methods of maintenance/ management of the public areasshown on the approved layout plans shall be submitted to and agreed in writing by the local planning with the local planning authority.
The reason for the condition is :-
Because the details have not been submitted and to secure maintenance of the area and the visual amenity of the area. |
| 14. | No work shall commence until the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of these materials have not been submitted. |
| 15. | The Reason for the Approval.
The application site has outline planning consent for residential development and is allocated for development in the Great Yarmouth Borough Wide Local Plan 2001. The Local Planning Authority considers that the details hereby approved subject to the above conditions and those imposed on the outline approval comply with Policy HOU5 and HOU9 of the Local Plan. |
| 16. | Please Note:- This permission is subject to the conditions and time constraints imposed on the Outline Planning Permission 06/99/0966/O unless variation is otherwise agreed by the local planning authority.
Natural England requests that the applicants should be informed that planning permission, does not absolve them from complying with the relevant law, including obtaining and complying with the terms and conditions of any licences required as described in Part IV B of the Circular 06/2005.
The applicants attention is drawn to the fact that there are underground electricity cables on the site and of the need for an electricity sub station that has not been considered as part of this submission of reserved matters. |