| No. | Condition Text |
|---|
| 1. | This permission expires on 10th October 2010 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the buildings shall be removed from the site.
The reason for the condition is:-
In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality. |
| 2. | Prior to the commencement of any development a flood response plan shall be submitted to and agreed in writing with the Local Planning Authority. This response plan, including information regarding the availability of the Environment Agency's 'Floodline' flood warning scheme, should be made available to future occupiers of the site by means of a fixed notice within the building prior to habitation. Fixed notices shall also be erected at each entrance to the site. All signs shall be kept legible, clear of obstruction and up-to-date if flood risk information changes.
The reason for the condition is :-
To minimise the risk to occupants and visitors to the site in the event of flooding. |
| 3. | Prior to the commencement of development, details of anchoring methodology, together with supporting calculations, are to be submitted to and agreed in writing with the Local Planning Authority. The submitted calculations shall be sufficient to prove that the buildings will be constructed to withstand both hydrostatic and hydrodynamic pressures associated with an overtop and/or breach in the defences adjacent to the development. All buildings shall be constructed in accordance with the agreed methodology.
The reason for the condition is :-
To maintain the structural integrity of the buildings in the event of a failure of the defences. |
| 4. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the requirements of Policy EMP15 of the Great Yarmouth Borough-Wide Local Plan. |