| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 2nd September 2005.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The minimum finished floor level should be set no lower than 2.14mAOD.
The reason for the condition is :-
To minimise the damage to property and risk to life in the event of flooding in accordance with the recommendations of the flood risk assessment.
|
| 4. | Prior to the commencement of any development, a flood responseplan shall be submitted to, and agreed in writing with the Local Authority. This flood response plan, including information regarding the availability of the Environment Agency's 'Floodline' flood warning scheme, should be made available to future occupiers of the site by means of a fixed notice within the building prior to habitation.
The reason for the condition is :-
To minimise the risk to the occupants in the event of flooding in accordance with the recommendations of the flood risk assessment. |
| 5. | Prior to the commencement of development, a scheme for the provision of flood proofing measures/techniques must be submitted to, and agreed in writing with, the Local Planning Authority. These measures should be incorporated into the development to at least 2.74mAOD. The works shall be constructed and completed in accordance with the approved plans and in accordance with ODPM guidance given in the publication 'Preparing for Floods'.
The reason for the condition is :-
To minimise the damage to property in the event of flooding in accordance with the recommendations of the flood risk assessment. |
| 6. | Non-return valves shall be installed on the drainage pipes.
The reason for the condition is :-
To prevent flooding from the sewers in the event of flooding in the area in accordance with the recommendations of the flood risk assessment. |
| 7. | Prior to the commencement of development, a scheme for the provision and implementation of water saving devices, incorporating the use of water butts with overflow pipes to the drainage system, shall be submitted to, and agreed in writing with, the Local Planning Authority. The works/scheme shall be constructed and completed in accordance with the approved plans/specification at such time as may be specified in the approved scheme.
The reason for the condition is :-
To reduce the risk of flooding to the development and to promote sustainable development in accordance with the recommendations of the flood risk assessment. |
| 8. | Notwithstanding the provisions of the Town and COuntry Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or withiout modification), no windows or other openings other than those expressly authorised by this permission) shall be constructed in the roof or walls of the building without the prior consent in writing of the Local Planning Authority.
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of adjacent property. |
| 9. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 ( or any order revoking and re-enacting that Order) the dwelling shall not be extended in any way without the prior consent of the Local Planning Authority.
The reason for the condition is:-
To enable the Local Planning Authority to retain control over any extensions to the dwelling in the interests of residential amenity. |
| 10. | The premises shall not be occupied until the conversion work has been carried out entirely in accordance with the approved plans and shall thereafter be maintained in accordance with the approved details.
The reason for the condition is:-
In order to ensure a satisfactory standard of accommodation. |
| 11. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan |