| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The surface of the bund shall be covered with a minimum of 500mm of top soil and the bund grassed within one year of completion of any section of the bund.
The reason for the condition is :-
In the interests of the visual amenities of the locality. |
| 3. | No materials shall be tipped on the site other than inert substances and no burning of materials shall take place anywhere on the site.
The reason for the condition is :-
For the avoidance of doubt and to prevent injury to the amenities of the area. |
| 4. | Prior to any further work being carried out on the bund details shall be submitted showing the positions of the existing trees together with measures to protect the trees during the course of the work and ensure that the increase in the height of the ground level does not adversely effect the trees.
The reason for the condition is :-
For the avoidance of doubt and to ensure the retention of the trees which represent an important visual amenity in the locality. |
| 5. | The existing trees on the site shall not be felled or damaged in any way without the prior consent in writing of the Local Planning Authority.
The reason for the condition is:-
The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained. |
| 6. | Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees, shrubs and grass shall be carried out in accordance with the scheme as approved within three months of the approval. Any trees and shrubs so planted which dies within 5 years shall be replaced within one year by the applicants or their sucessors in title.
The reason for the condition is:-
To enhance the visual amenities of the locality |
| 7. | The bund shall not exceed 900mm in height for a distance of five metres measured either side of the vehicular access to the site onto Pump Lane.
The reason for the condition is :-
In the interests of highway safety. |
| 8. | NOTES - Please read the following notes carefully:-
This permission does not purport to convey any consent for the infilling of the adjoining drainage ditch and adequate measure shall be taken to prevent material blocking the ditch. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal is considered to be meet the requirements of NNV25 of the Great Yarmouth Borough-Wide Local Plan. |