| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | Prior to the occupation of the dwelling hereby approved any access gates shall be hung to open inwards and shall be set back a minimum distance of 5 metres from the near edge of the adjoining highway carriageway. Any sidewalls adjacent to the access shall be splayed at an angle of 45 degrees from each gatepost to the front boundary of the site.
The reason for the condition is :-
In the interests of highway safety. |
| 3. | Prior to the first occupation of the dwelling hereby approved the proposed vehicular access shall be constructed in accordance with Norfolk County Council residential access specification for the first 4.5 metres into the site as measured back from the near edge of the adjacent carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | Prior to the first occupation of the dwelling hereby approved the proposed on-site parking area shall be laid out, demarcated, levelled, surfaced and drained and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the provsion of adequate on-site parking and turning facilities for the development. |
| 5. | Prior to the occupation of the dwelling hereby approved all planting/obstructions along the site frontage within 2 metres of the edge of the existing highway shall be lowered to a height not exceeding 600mm above the level of the adjacent carriageway and shall be maintained not exceeding this height thereafter.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | The development shall be constructed with a minimum finished floor level of 3.75m AODN.
The reason for the condition is :-
To minimise the risk of flooding to the development in accordance with Planning Policy Guidance Note 25, Development and Flood Risk. |
| 7. | Prior to the commencement of any development, details of wet-proofing measures, in accordance with the OPDM publication 'Preparing for Floods', up to the level of 4.0m AODN shall be submitted to and agreed in writing with the Local Planning Authority. The works/scheme shall be carried out in their entirety before the development is first occupied.
The reason for the condition is :-
To minimise the damage that flooding may cause to the development. |
| 8. | Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees and shrubs shall be carried out in accordance with the scheme as approved within 9 months of the occupation of the dwelling. Any of these trees or shrubs which die, are removed, become seriously damaged or diseased within 3 years shall be replaced within one year by the applicants or their successors in title, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
To enhance the visual amenities of the locality. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan |