| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The proposed vehicular access shall be constructed in accordance with N.C.C.access specification for the first 4.5 metres into the site as measured back from the near edge of the adjacent carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 3. | Prior to the access being brought into use, any access gates shall be hung to open inwards and shall be set back a minimum distance of 5 metres from the near edge of the adjoining highway carriageway. Any sidewalls or fences adjacent to the access shall be splayed at an angle of 45 degrees from each gatepost to the front boundary of the site.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | Prior to the access hereby approved being brought into use, all/planting/obstructions within 2 metres of the edge of the highway carriageway from the proposed field access to the existing holiday park access to the south of the site shall be lowered to a height not exceeding 600mm above ground level and shall be maintained not exceeding this height thereafter.
The reason for the condition is :-
In the interests of highway safety. |
| 5. | The new access hereby approved shall only be used as a field access to serve the existing equestrian/grazing use of the land and shall not be used as an access to the adjoining holiday park or any other use.
The reason for the condition is :-
To ensure that the access is used as contemplated by the Local Planning Authority on the grant of this permission and to enable the Local Planning Authority to retain control over the development. |
| 6. | NOTES - Please read the following notes carefully:- |
| 7. | The County Director of Planning and Transportation has indicated that if it is necessary to reposition any street furniture, this will be done at the applicant's expense. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
Subject to compliance with the above conditions the proposal will not conflict with policies TCM13, BNV1 or NNV2 of the adopted Local Plan |