1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development shall be carried out in accordance with drawing no's. 12 and 14 received by the Local Planning Authority on 2nd September, 2003 and revised drawings no's 13 rev.A and 15 rev.B received on 2nd October and 3rd November respectively. The reason for the condition is:- For the avoidance of doubt.
3.No work shall commence until the colour(s) of the materials of the walls and roof have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of the materials have not been submitted.
4.The existing trees and shrubs on the boundaries of the site shall not be felled or damaged in any way without the prior consent in writing of the Local Planning Authority. The reason for the condition is:- The existing trees and shrubs represent an important visual amenity which the Local Planning Authority consider should be substantially maintained.
5.Prior to the church building being brought into use the turning head to Queen Annes Road shown on drawing no. 15 rev.B shall be constructed in accordance with Norfolk County Council's approved specifications. The reason for the condition is:- To ensure a satisfactory development of the site and a satisfactory standard of highway design and construction.
6.Prior to the church building being brought into use the existing footpath to Queen Annes Road shown on drawing no. 15 rev.B shall be improved to a standard to be agreed, in writing, with the Local Planning Authority. The reason for the condition is:- In the interest of highway safety.
7.Prior to commencement of the use of the building hereby approved the parking and servicing area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter for that specific use. The reason for the condition is:- To ensure the permanent availability of the parking/manoeuvring area, in the interest of highway safety.
8.The minimum floor level of the building hereby permitted shall be set at 1.5m AOD. The reason for the condition is:- To reduce the risk of flooding to the development.
9.Wherever possible flood-proofing measures shall be incorporated into the development according to the guidelines contained in the DTLR document 'Preparing for Floods'. The reason for the condition is:- To minimise the damage to the development in the event of flooding.
10.Non-return valves shall be installed in the drainage pipes. The reason for the condition is:- To prevent flooding from the sewers in the event of tidal/fluvial flooding in the area.
11.The contractors for the development hereby approved shall adhere to the following hours of work, which apply to all works causing noise audible at the site boundary:- Monday to Friday 07:30 - 18:00hrs. Saturday 08:00 - 13:00hrs. Sundays and Bank Holidays No Working unless such work is:- a) associated with an emergency or; b) carried out with the prior approval of the Council. The reason for the condition is:- In the interests of the amenities of the occupiers of nearby buildings.
12.Where it is necessary to drive piles, the applicant shall follow the specific procedures detailed in BS 5228 and select the quietest appropriate method. With regard to piling operations, the Council expects the contractor to adhere to the following hours of work for the piling operations:- Monday to Friday 08:00 - 18:00 Saturday 08:00 - 13:00 Sundays and Bank Holidays No working unless such work is:- a) associated with an emergency or; b) carried out with the prior approval of the Council. The reason for the condition is:- In the interest of the amenities of the occupiers of nearby buildings.
13.NOTES - Please read the following notes carefully:-
14.This permission does not purport to grant consent for the signs and flagpoles shown on the submitted drawings and the applicant is reminded of the need to make a separate application for these items under The Town and Country Planning (Control of Advertisements) Regulations 1992.