| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the with the Drawings No.1712-110,1712-111B, 1712-112,1712-113,1712-114,171-115,
1712-154.
The reason for the condition:-
For the avoidance of doubt and in accordance with the submitted details. |
| 3. | The premises shall only used for the sale of bulky comparison goods consisting of building and DIY products; garden products and plants, pets and pets supplies,furniture,carpets, floor coverings and house hold furnishings,electrical and gas;vehicle accessories and and parts,bicycles and cycle accessories,office supplies,computers and accessories and boating equipment(excluding boats) and any other goods which are ancillary and related to the main goods permitted.
The reason for this condition:-
For the Local Planning Authority to retain control over the goods sold in order to minimise the impact of the development on the vitality of the town centre. |
| 4. | Deliveries to the service yards shall only take place between the hours of 07.00 to 23.00 Monday to Saturday and between the hours of 09.00 and 21.00 on Sundays or Bank Holidays.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the nearby properties.
|
| 5. | Prior to the commencement of the development, full details of the proposed method of surface water discharge and treatments of the drainage dykes crossing the site shall be submitted to and approved by the Local planning Authority. The works hereby approved shall be completed prior to the store hereby permitted being brought into use.
The reason for the condition is:-
In order to effect satisfactory drainage arrangements both on and from the site and to avoid problems of pollution of nearby watercourses and to avoid surcharging of the existing dyke system. |
| 6. | The planting of trees and shrubs shall be carried out in accordance with the scheme as approved prior to the opening of the store. Any trees and shrubs so planted which dies within 5 years shall be replaced within one year.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 7. | Details of an accoustic barrier and accoustic controls to be provided between the store and the eastern boundary of the site shall be submitted for the approval of the Local Planning Authority and works in accordance with such a scheme as approved shall be completed prior to the opening of the stores and thereafter maintained in the approved form.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjoining properties. |
| 8. | Prior to the commencement of the use hereby permitted visibility splays shall be provided in full accordance with the details on approved Drawing 1712/111B. The splays shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is:-
In the interest of highway safety.
|
| 9. | Prior to the commencement of the development and to the satisfaction of the Local Planning Authority a site investigation shall be carried out to assess whether the land is contaminated; the investigation shall include details of known previous uses and possible contamination arising from those uses.If contamination is found or suspected to exist, a scheme to remediate the site to a standard suitable for its proposed use shall be forwarded to and approved by the Local planning Authority.
The reason for the condition:-
In accordance with the Environmental Protection Act 1990 Part11A. |
| 10. | No mezzanine floors shall be inserted in the buildings hereby approved without the prior written approval of the Local Planning Authority.
The reason for the condition is:-
For the Local Planning Authority to retain control over the development and to protect the vitality of the town centre. |
| 11. | The premises shall not be brought into use until the car parking and turning facilities have been provided in accordance with the approved plans.
The reason for the condition is:-
In order to ensure satisfactory off-street parking to meet the needs generated by the development. |
| 12. | No storage shall take place on the car parking and manouevring areas indicated on the approved plans.
The reason for the condtion is:-
In order to ensure the retention and availability of the approved car parking areas. |
| 13. | NOTES - Please read the following notes carefully:-
The applicant is advised that Measures will have to be taken to prevent naturally occurring methane gas being released following piling of the site.
Any culverting of the water course requires the written approval of the Local Planning Authority under the terms of the Public Health Act 1936 and the prior written consent of the of the Environment Agency under the terms of the Land Drainage Act 1991/ Water Resources Act 1991. |