Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development shall be carried out in accordance with the revised drawings received by the Local Planning Authority on 15th May 2003. The reason for the condition is :- For the avoidance of doubt
3.Before the development is commenced details of the treatment of the boundary of the application site with 5 Station Road shall be submitted to the Local Planning Authority. The measures subsequently approved shall be carried out before work is commenced on the development. The reason for the condition is :- To protect the residential amenities of the adjoining occupiers as such details have not been submitted as part of this application.
4.The means of enclosure along the boundary of the application site indicated on the approved drawings shall be erected before the dwellings hereby approved are occupied. The reason for the condition is :- In the interests of the residential amenities of the adjoining occupiers
5.No gates shall be installed at the access to the site. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the dwellings hereby approved, the proposed vehicular access shall be constructed in accordance with N.C.C. residential access specification for a distance of 4.5 metres measured into the site from the near edge of the existing carriageway. The reason for the condition is :- In the interests of highway safety.
7.Prior to the first occupation of the dwellings hereby approved the proposed private driveway shall be maintained at a minimum width of 5 metres for a distance of 10 metres into the site measured from the front boundary. The reason for the condition is :- In the interests of highway safety.
8.Prior to the first occupation of the dwellings hereby approved, parking and turning areas, in accordance with the submitted details, shall be provided within the curtilage of the site. The reason for the condition is :- To ensure the provision of adequate access, turning and car parking facilities for the development.
9.Adequate surface water drainage measures shall be provided to prevent surface water discharging from the proposed private drive direct to the public highway. The reason for the cxondition is :- To prevent overload of the highway surface water drainage system.
10.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 ( or any order revoking and re-enacting that order with or without modifications), no extensions to the bungalows or dormer windows or other openings to the roofspaces shall be provided unless otherwise specified in writing by the Local Planning Authority. The reason for the condition is :- To safeguard the amenities of the occupiers of the existing residential properties adjoining the application site.
11.The applicant's attention is drawn to the attached letter from the Environment Agency (Anglian Region) and the need to comply fully with their requirements.