| No. | Condition Text |
|---|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | This permission relates to the erection of the building as dimensioned on the submitted drawing and not having a floor area exceeding 170 square metres. The reason for the condition is :- For the avoidance of doubt. |
| 3. | The building hereby approved shall only be used for tractor storage and a workshop in association with the agricultural use of the adjoining land. The reason for the condition is:- Permission has been given on the basis that the building is required for agricultural purposes only and to accord with Policy NNV7 of the Borough-Wide Local Plan which seeks to protect the countryside from inappropriate development, |
| 4. | Before the building hereby approved is brought into use, a vision splay measured 2 metres back from the carriageway edge and 70 metres along the carriageway shall be provided and subsequently maintained to the west of the access onto Cherry Lane by lowering the bank and trimming the hedge as necessary. The reason for the condition is :- In the interests of highway safety. |