| No. | Condition Text |
|---|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990. |
| 2. | The signage shall be erected in accordance with Drawings(file name) No.2580-1.1 Revision A and 2580-2.1 Revision A. The reason for the condition:- For the avoidance of doubt and in accordance with the application submission. |
| 3. | A minimum vertical clearance of 2.44 shall be maintained between the projecting sign and the level of the public highway. The reason for the condition is:- In the interest of highway safety. |