Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The permission in respect of the buildings and poly tunnels on the site expires on 31st August 2007 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the buildings shall be removed from the site. The reason for the condition is:- In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality.
3.The area of land shown on the submitted site layout drawing as area of trees, shrubs and overgrowth shall be retained and shall not be cleared or altered in any way without the prior written consent of the Local Planning Authority. The reason for the condition is:- The existing trees and shrubs form an area of essential screening with the Local Planning Authority consider should be retained in the intrests of the visual amenities of the locality.
4.Prior to any work commencing on the development hereby permitted revised details shall be submitted for the approval of the Local Planning Authority of parking to serve the development in the form of one staff parking space and four student parking spaces together with cycle parking and works in accordance with such details as may be approved shall be completed prior to the facility first being brought into use. The reason for the condition is:- To ensure the provision of adequate parking to serve the development proposed.
5.The proposed access shall be laid out in accordance with the details shown on the approved drawing and all planting/obstructions withinn the required visibility splays shall be lowered to a height not exceeding 600mm above the level of the adjacent highway carriageway and shall be maintained not exceeding this height thereafter. The reason for the condition is:- To ensure the provision of a satisfactory access to serve the proposed development.
6.NOTES - Please read the following notes carefully:- If required any stret furniture shall be repositioned at the applicant's own expense.