| No. | Condition Text |
|---|
| 1. | No development whatsoever shall take place until full details of the siting, design, external appearance, means of access and landscaping of the development have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 2. | Application for approval of reserved matters must be made not later than the expiration of three years beginning with the date of this permission and the development must be begun not later than whichever is the later of the following dates:- a) the expiration of five years from the date of this permission; or b) the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
The reason for this condition:-
Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990. |
| 3. | The details to be submitted as required by condition 1 shall include in the development the noise attenuation measures referred to in the report prepared by Adrian James Acoustics.
The reason for the condition is :-
In order to ensure that the development is not adversely effect by operations in the nearby port area. |
| 4. | Prior to the commencement of the development hereby permitted full details (in the form of scaled plans and/or written specification) shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority to illustrate the following:-
Access arrangements, including visibility splays
Parking provision in accordance with adopted standards
Servicing areas
Turning areas
The reason for the condition is :-
In the interests of highway safety. |
| 5. | The development hereby permitted shall not be commenced until a Travel Plan has been sumitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority, such Travel plan shall accord with Norfolk County Council document 'Guidance Notes for the Submission of Travel Plan' and shall include a timetable for implementation.
The reason for the condition is :-
To ensure that the development is as sustainable as possible. |
| 6. | No part of the development hereby permitted shall be occupied prior to the implementation of the Approved Travel Plan referred to in condition 4 above. Those parts of the approved Travel Plan implemented in accordance with the timetable contained therein shall continue to be implemented as long as any part of the development is occupied.
The reason for the condition is :-
To ensure that the development is sustainable as possible. |
| 7. | Prior to the commencement of development a scheme for the provision and implementation of flood proofing measures must be submitted to and agreed in writing with the Local Planning Authority. The minimum floor level of the development should be set at a minimum of 3.2mAOD with flood proofing measures incorporated in the development up to that level.
The reason for the condition is :-
To minimise the damage to the development in the event of flooding. |
| 8. | Non return valves shall be installed on the drainage pipes associated with the development.
The reason for the condition is :-
To prevent flooding from the sewers in the event of tidal/fluvial flooding in the area. |
| 9. | Prior to the occupation of the Centre an evacuatiuon plan shall be submitted to and agreed in writing with the Local Planning Authority, who should consult the emergency services.
The reason for the condition is :-
To minimise the risk to life in the event of flooding. |
| 10. | Foul drainage shall not be discharge other than to the foul sewer. Surface water drainage shall be discharged in accordance with details to be submitted to and approved by the Local Planning Authority before any work takes place on site.
The reason for the condition is:-
In order to effect satisfactory drainage arrangements both on and from the site and to avoid problems of pollution of nearby water courses. |
| 11. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of Policy EDC6 of the Great Yarmouth Borough-Wide Local Plan in providing a cultural facility that will attract arts and cultural events to the Borough.
continued on next page |
| 12. | NOTES - Please read the following notes carefully:-
The Environment Agency make the following advisory comments:-
Under the terms of the Water Resources Act 1991 and the Land Drainage Byelaws, the prior written consent of the Agency is required for any proposed works or structures either affecting or within 9 metres of the tidal or fluvial flood defence.
The floodproofing measures referred to in condition 7 should accord with the guidance given in the publication 'Preparing for Floods' available from www.gov.uk or by calling 0870 1207 405.
Norfolk County Council as Highway Authority ask that the following informative notes are taken into account:-
a). This development involves work to the public highway that will require the approval of the County Council, as Highway Authority. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Area Manager based at Aysham (tel 01263 738300).
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
b). This development involves work to the public highway that can only be undertaken by the County Council within the scope of a Legal Agreement with the applicant. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are obtained. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall. Please ontact Mike Rayner (tel 01603 223273).
c). This development involves a Travel Plan to be implemented within the scope of a Legal Agreement between the applicant and the County Council. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Town and Country Planning Act 1990 or Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall in Norwich. Please contact Mike Rayner (tel. 01603 223273).
continued on next page |
| 13. | The applicant's attention is drawn to the following comments with respect to any construction works from the Head of Environmental Health:-
a) i) All contracors should follow the provisions of BS 5228 relating to noise control on construction and demolition sites.
ii) Construction should only be carried out between the hours of 07.30 to 18.00 Mondays to Fridays and 08.00 to 13.00 on Saturdays with no working on Sundays or Bank Holidays.
iii) Piling should be restricted to the hours of 08.30 to 17.00 Monday to Friday and 09.00 to 13.00 SAturdays
The applicant is strongly recommended to ensure that local residents are kept fully informed of the proposed works, including contact names and telephone numbers in the event of problems arising.
b) Noise emanating from activities within the structure [LAeq (5min)] do not exceed a level 10dB below measured background level [LA90 (5min)]. All measured at the boundary of the development and in accordance with BS4142:1997.
|