Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.Prior to the access being brought into use it shall be constructed in accordance with Norfolk County Council's residential access specification for a distance of 4.5 metres measured (into the site) from the near edge of the existing highway carriageway. The reason for the condition is :- To ensure the provision of an adequate means of access in the interests of highway safety.
3.Prior to the access being brought into use a levelled and hardened turning area as indicated in the submitted details shall be constructed within the site. The reason for the condition is :- To enable vehicles to enter and leave the site in a forward gear in the interests of highway safety. continued on next page :-
4.Adequate measures shall be provided to prevent surface water from discharging direct to the public highway. The reason for the condition is :- In the interests of highway safety.
5.Prior to the access being brought into use all planting along the site frontage within 2 metres of the near edge of the existing highway carriageway shall be lowered to a height not exceeding 0.6 metres above the level of the carriageway, and shall thereafter be so maintained. The reason for the condition is :- In the interests of highway safety.
6.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no gates shall be installed at the access to the site. The reason for the condition is :- In the interests of highway safety.